Candy Industry SMED/QuickChangeover
A candy manufacturer approached us for assistance in reducing their 48-hour changeover time to meet increased production demands. During their Lean Six Black Belt Training, the engineers identified their changeovers as the source of 100% downtime. Recognizing the potential for increased production time if changeovers were reduced, they were determined to implement a change. We provided them with a foundational Lean training session, covering the eight wastes in any manufactur
Dan Roth
Mar 31 min read


Food Industry
Problem: The projected weekly customer demand for finished goods was 25% greater than the plant's current 24-7 capacity. The client had...
Dan Roth
Feb 28, 20211 min read


Warehouse
Problem: The incoming warehouse is holding over $3,000,000 of raw materials. The warehouse consumes over 3,000 square feet of floor...
Dan Roth
Feb 25, 20211 min read


Adhesives Industry
Problem: A traditional push manufacturing system is causing excess raw materials and work in process inventories. Therefore costs are...
Dan Roth
Feb 25, 20211 min read


Packaging and Shipping
Problem: Orders were being shipped late. The warehousing, packaging and shipping department was unorganized. A traditional layout was...
Dan Roth
Feb 25, 20211 min read