Candy Industry SMED/QuickChangeover
A candy manufacturer approached us for assistance in reducing their 48-hour changeover time to meet increased production demands. During their Lean Six Black Belt Training, the engineers identified their changeovers as the source of 100% downtime. Recognizing the potential for increased production time if changeovers were reduced, they were determined to implement a change. We provided them with a foundational Lean training session, covering the eight wastes in any manufactur
Dan Roth
Mar 31 min read
Â
Â
Â


Food Industry
Problem: The projected weekly customer demand for finished goods was 25% greater than the plant's current 24-7 capacity. The client had...

Dan Roth
Feb 28, 20211 min read
Â
Â
Â


Warehouse
Problem: The incoming warehouse is holding over $3,000,000 of raw materials. The warehouse consumes over 3,000 square feet of floor...

Dan Roth
Feb 25, 20211 min read
Â
Â
Â


Adhesives Industry
Problem: A traditional push manufacturing system is causing excess raw materials and work in process inventories. Therefore costs are...

Dan Roth
Feb 25, 20211 min read
Â
Â
Â


Packaging and Shipping
Problem: Orders were being shipped late. The warehousing, packaging and shipping department was unorganized. A traditional layout was...

Dan Roth
Feb 25, 20211 min read
Â
Â
Â


Final Processing and Shipping
Problem: Customers were upset because the wrong products were being shipped to them. Final processing is very unorganized with no...

Dan Roth
Feb 25, 20211 min read
Â
Â
Â


Wire Mesh Industry
Problem: Labor costs were increasing for the warehousing, cutting and shipping processes because of lack of workplace organization....

Dan Roth
Feb 25, 20211 min read
Â
Â
Â


Printing Industry
Problem: Orders were being shipped late. Lead-times were too long. The warehouse was full of finished goods. Over ten percent of the...

Dan Roth
Feb 25, 20211 min read